Which of the following are the architect’s responsibilities during the bidding phase?
Check the two that apply.

2 / 10

Which event must occur before the construction start date under the Stipulated Sum agreement?

3 / 10

An owner instructs the architect to issue clarifications via email directly to a preferred bidder to accelerate bidding.
What should the architect do?

4 / 10

During bidding, a contractor submits a request to use an alternate mechanical unit not listed in the specs. The request is received three days before the bid opening.
What should the architect do?

5 / 10

Which of the following documents are typically included in the project manual for bidding purposes?
Check the three that apply.

6 / 10

During the design phase, the owner adds a rooftop amenity deck not included in the initial scope. What is the most appropriate next step for the architect?

7 / 10

Which of the following statements about Construction Change Directives (CCDs) are true?
Check the two that apply.

8 / 10

During pre-bid RFI review, the architect receives a question indicating a discrepancy between the structural and architectural drawings. What should the architect do?

9 / 10

The project team selects the Construction Manager as Constructor (CMc) delivery method. What impact does this have on preconstruction roles?

10 / 10

A contractor submits a bid containing an alternate not listed in the bidding documents. The bid amount is significantly lower than others. What is the architect’s responsibility?